Concept development

NukeReactor™

A modular reactor concept intended to supply electricity on site to data centers and industrial facilities. The preliminary electrical output target is 25 MWe.

Illustrative manufacture of a closed horizontal module; not a photograph of NukeSystems fabrication.
Project visualization

What it is meant to address

Data centers and industrial sites need large amounts of electricity around the clock. Grid capacity at many sites is limited or slow to expand.

NukeReactor explores whether a factory-built, modular reactor system could supply that electricity on site, as a project the customer plans together with the site.

How the system is arranged

The working layout is two modules. One houses the reactor; the other houses energy conversion and electrical equipment. Cooling, the electrical connection and other site systems sit outside the modules. Underground placement is the current design direction.

Electrical output
25 MWe, preliminary target
Layout target
Two modules with 40 ft high-cube dimensions
Module dimensions
12.192 × 2.438 × 2.896 m each (external target)
Placement
Underground (current design direction)
Energy conversion
Conversion cycle under engineering assessment
Stage
Concept development

Concept diagram

System architecture at a glance

An original diagram illustrating the intended functional connections. It is not a verified engineering drawing or a model of built hardware.

Conceptual systems flow for NukeReactor
Concept study · functional blocks only · component sizes and interfaces require engineering confirmation.

Technical atlas · early study

Four views of the proposed system

Editable vector illustrations for early discussions. These are functional diagrams, not approved construction drawings.

Concept study: Site arrangement
Site arrangement · Concept only; not to scale or validated.
Concept study: Energy and heat
Energy and heat · Concept only; not to scale or validated.
Concept study: Control and data separation
Control and data separation · Concept only; not to scale or validated.
Concept study: Factory to site
Factory to site · Concept only; not to scale or validated.

Intended process

Intended lifecycle, from factory to operation

The sequence below describes how a future project is intended to proceed. None of these stages has been carried out yet.

  1. Fabrication

    Reactor and conversion modules would be built in a controlled factory environment.

  2. Quality control

    Materials, welds and assemblies would be inspected and documented against the applicable codes.

  3. Factory testing

    Non-nuclear functional tests of systems and controls before shipment.

  4. Preparation for delivery

    Modules secured and configured for transport; route and handling plans prepared.

  5. Transport

    Delivery by heavy-haul road and, where needed, by sea.

  6. Underground installation

    Placement in a prepared underground structure at the site.

  7. Connection

    Cooling, electrical connection and site systems connected and commissioned, subject to approvals.

  8. Monitoring and service

    Operation supported by monitoring, a digital model and remote inspection.

Status

What is defined and what needs verification

Defined now

  • Purpose: on-site electricity for data centers and industry
  • Preliminary electrical output target of 25 MWe
  • Two-module layout target with 40 ft high-cube dimensions
  • Underground placement as the design direction

Requires verification

  • Whether the full system fits the dimensional target; mass and shielding
  • Energy conversion technology and efficiency
  • Cooling and heat rejection at the site
  • Transport configuration and handling
  • Depth, civil works and access for installation and service
  • Licensing pathway and regulatory review

Related material

Sources and related pages

Listing a publication or tool does not imply collaboration, endorsement or use in a completed study. See Engineering & Sources.

FAQ

Questions

Has a NukeReactor been built?

No. NukeReactor is at the concept development stage. No reactor or prototype exists.

Does the whole power plant fit in two shipping containers?

Not necessarily. The two-module, 40 ft high-cube layout is a dimensional target. Cooling and site systems are outside the modules, and mass, shielding and transport need engineering verification.

How will reactor heat become electricity?

A power conversion module is part of the proposed two-module layout. Candidate conversion cycles and the required heat rejection will be compared in future engineering studies before selecting a design.

Is 25 MWe a measured value?

No. It is a preliminary electrical output target, not a measured or guaranteed figure.

Discuss a potential site

Tell us about the location and the load you need to supply.