Concept development
NukeReactor™
A modular reactor concept intended to supply electricity on site to data centers and industrial facilities. The preliminary electrical output target is 25 MWe.

What it is meant to address
Data centers and industrial sites need large amounts of electricity around the clock. Grid capacity at many sites is limited or slow to expand.
NukeReactor explores whether a factory-built, modular reactor system could supply that electricity on site, as a project the customer plans together with the site.
How the system is arranged
The working layout is two modules. One houses the reactor; the other houses energy conversion and electrical equipment. Cooling, the electrical connection and other site systems sit outside the modules. Underground placement is the current design direction.
- Electrical output
- 25 MWe, preliminary target
- Layout target
- Two modules with 40 ft high-cube dimensions
- Module dimensions
- 12.192 × 2.438 × 2.896 m each (external target)
- Placement
- Underground (current design direction)
- Energy conversion
- Conversion cycle under engineering assessment
- Stage
- Concept development
Concept diagram
System architecture at a glance
An original diagram illustrating the intended functional connections. It is not a verified engineering drawing or a model of built hardware.
Technical atlas · early study
Four views of the proposed system
Editable vector illustrations for early discussions. These are functional diagrams, not approved construction drawings.
Intended process
Intended lifecycle, from factory to operation
The sequence below describes how a future project is intended to proceed. None of these stages has been carried out yet.
Fabrication
Reactor and conversion modules would be built in a controlled factory environment.
Quality control
Materials, welds and assemblies would be inspected and documented against the applicable codes.
Factory testing
Non-nuclear functional tests of systems and controls before shipment.
Preparation for delivery
Modules secured and configured for transport; route and handling plans prepared.
Transport
Delivery by heavy-haul road and, where needed, by sea.
Underground installation
Placement in a prepared underground structure at the site.
Connection
Cooling, electrical connection and site systems connected and commissioned, subject to approvals.
Monitoring and service
Operation supported by monitoring, a digital model and remote inspection.
Status
What is defined and what needs verification
Defined now
- Purpose: on-site electricity for data centers and industry
- Preliminary electrical output target of 25 MWe
- Two-module layout target with 40 ft high-cube dimensions
- Underground placement as the design direction
Requires verification
- Whether the full system fits the dimensional target; mass and shielding
- Energy conversion technology and efficiency
- Cooling and heat rejection at the site
- Transport configuration and handling
- Depth, civil works and access for installation and service
- Licensing pathway and regulatory review
Related material
Sources and related pages
- Small Modular Reactors: Advances in SMR Developments 2024International Atomic Energy Agency (IAEA) · reference
- Advanced reactors: pre-application process for prospective applicantsU.S. Nuclear Regulatory Commission (NRC) · reference
- Evaluated Nuclear Data File (ENDF) libraryNational Nuclear Data Center, Brookhaven National Laboratory (NNDC/BNL) · reference
- OpenMC Monte Carlo neutron and photon transport code — documentationOpenMC development community (originated at MIT) · reference
- MOOSE — Multiphysics Object-Oriented Simulation EnvironmentIdaho National Laboratory (INL) · reference
Listing a publication or tool does not imply collaboration, endorsement or use in a completed study. See Engineering & Sources.
- NukeFarm™Energy
FAQ
Questions
Has a NukeReactor been built?
No. NukeReactor is at the concept development stage. No reactor or prototype exists.
Does the whole power plant fit in two shipping containers?
Not necessarily. The two-module, 40 ft high-cube layout is a dimensional target. Cooling and site systems are outside the modules, and mass, shielding and transport need engineering verification.
How will reactor heat become electricity?
A power conversion module is part of the proposed two-module layout. Candidate conversion cycles and the required heat rejection will be compared in future engineering studies before selecting a design.
Is 25 MWe a measured value?
No. It is a preliminary electrical output target, not a measured or guaranteed figure.
Discuss a potential site
Tell us about the location and the load you need to supply.